Current Road Closures, Diversions and Traffic Disruptions

Details of road closures and diversions currently in place in West Lothian.

It is our aim to limit the inconvenience to road users during maintenance works however, from time to time, we need to close roads or divert the traffic.

For Emergency and Unplanned Road Closures please visit the Emergency Road Closures page.

For parades please visit Traffic disruptions due to parades

For road works in West Lothian which do not result in a complete closure, diversion, or parking suspension please check Scottish Road Works Online.

North Bridge Street will be closed between South Bridge Street and Mansefield Street for Scottish Power infrastructure upgrade.
Various closures will be in place over 4 successive Sundays to accommodate road resurfacing. The works will not commence until closure of A801 at Junction 4 of M8 has been removed
Skolie Burn Bridge will be closed over 3 weekends to complete bridge and carriageway works.
The C19 will be closed from the junction with B8046 eastwards to the Glendevon Farm access for installation of water main associated with new housing development.
The U40 will be closed from C24 junction to B7008 junction for carriageway resurfacing.
The U37 will be closed to vehicles over 10 metres in length and 7.5 tonnes in weight from the junction with Burnside Road northwards for approximately 300 metres to facilitate operational access to premises.
The U37 will be closed on a phased basis for installation of services associated with a new housing development.